Mineral Mine, Cooljarloo (Australia)Thursday, April 12, 2012"Post-treatment, the wells are now producing a higher water yield at a lower cost, with reduced down time"
|
![]() |
Geothermal Plant, Lodi (Italy)Wednesday, April 11, 2012"The system was returned to full operational use without subsequent borehole clogging"
|
![]() |
Public Water Supply, Fair Isle (Scotland)Monday, January 02, 2012"After treatment, the average flow jumped from 16.66l/min to 22.22l/min, a significant increase - That's a SC increase of 1300% !"
|
![]() |
EDF Building at Le Defence, Paris (France)Sunday, January 01, 2012"After treating the system, the M&E contracrtor reported increased flow, presure and performance"
|
![]() |
Public Water Supply, Belfast (N Ireland)Sunday, January 01, 2012"The yield of 4Ml/day was restored and the abandoned borehole was brought back into public supply one week after the treatment"
|
![]() |
Public Water Supply, Hastings (UK)Monday, August 01, 2011"A GCMS scan, taken after clearance pumping, showed all iron oxide residues had been removed"
|
![]() |
Slope Stabilisation, Isle of Wight Coast (UK)Thursday, November 25, 2010"The council have used BoreSaver since 2005 and it now forms part of their regular maintenance programme"
|
![]() |
Retail and industrial Complex, Milan (Italy)Thursday, November 25, 2010"The M&E contractor later reported a doubling of performance on the three worst affected plants with an increased performance across all plants"
|
![]() |
Open Cut Mine, Queensland (Australia)Wednesday, September 15, 2010"The pumps are now working at maximum efficiency and the water output and flow has increased"Â
|
![]() |
Hydraulic Barrier, Falconara (Italy)Thursday, June 10, 2010"Following the treatment, pump output achieved 28m3/hr, up from 12m3/hr, an increase of 233%"
|