News Headlines: 

CASE STUDIES

Wednesday, 11 April 2012
Lodi (Geothermal Well) Case Study

A geothermal plant servicing an air conditioning system contaminated with iron bacteria.

" The system was returned to full operational use without subsequent borehole clogging. "

Product: BoreSaver Ultra C Pro

Monday, 2 January 2012
Scotland (Public water Supply) - Case Study

Remediation of a public water supply production borehole contaminated with manganese and/or iron oxide deposits.

" After treatment, the average flow jumped from 16.66l/min to 22.22l/min, a significant increase - that's a SC increase of 1300% !"

Product: BoreSaver Ultra C

Sunday, 1 January 2012
Paris (EDF Building) - Case Study

Heat exchangers servicing the EDF building at Le Defence were clogged with iron oxide residues, affecting the water flow rate and pump efficiency.

"After treating the system, the M&E contractor reported increased flow, pressure and performance."

Product: BoreSaver Ultra C

Sunday, 1 January 2012
Belfast (Public Water Supply) - Case Study

The remediation of a well that had been abandoned 3 years previously due to extensive iron oxide and iron bacteria clogging.

" The yield of 4Ml/day was restored and the abandoned borehole was brought back into public supply one week after the treatment."

Product: BoreSaver Ultra C

Monday, 1 August 2011
Hastings (Public Water Supply) - Case Study

Rehabilitation of the wells, tunnels and adios at the Brede site facility from iron oxide contamination.

" A GCMS scan, taken after clearance pumping, showed all iron oxide residues had been removed. "

Product: BoreSaver Ultra C and BoreSaver Liquid Enhancer


Page 2 of 3    (14 Articles)
Home     
+44(0)1473 462046 |
Search: